Art. 20
1 The investigation, monitoring and remediation measures shall be carried out by the holder of the polluted site. 2 If the authorities have reason to believe that the pollution of the site was caused by the action of third parties, the authorities may require them to carry out the preliminary investigation, the monitoring measures or the detailed investigation. 3 If the pollution of the site was caused by the action of third parties, the authorities may require these with the approval of the holder to prepare the remediation project and perform the remediation measures. BGE
136 II 370 (1C_374/2007) from 7. Juni 2010
Regeste: Anfechtbarer Zwischenentscheid im Sinne von Art. 93 Abs. 1 lit. a BGG; Pflicht zur Beurteilung innert angemessener Frist nach Art. 29 Abs. 1 BV; Durchführung der altlastenrechtlichen Untersuchungen durch den Kanton gestützt auf Art. 32c Abs. 3 USG. Die Verpflichtung zur Durchführung einer altlastenrechtlichen Detailuntersuchung ist für die Beschwerdeführerin mit einem nicht wieder gutzumachenden Nachteil verbunden, da die Vorfinanzierung der Untersuchungskosten den Konkurs der Pflichtigen zur Folge haben könnte. Ein Eintreten ist zudem geboten, weil im kantonalen Verfahren die Pflicht zur Beurteilung innert angemessener Frist verletzt wurde (E. 1). Da der Kanton Inhaber eines grossen Teils des eventuell sanierungsbedürftigen belasteten Standorts ist und ihm der Vollzug des Umweltrechts obliegt, hat er selber die noch notwendigen Untersuchungen zu veranlassen. Anwendungsfall von Art. 32c Abs. 3 USG, der die behördliche Ersatzvornahme regelt (E. 2). |