Art. 42c Measures to remediate the bed load budget 68
1 In the case of installations which according to the plan require measures to remediate the bed load budget, the cantons shall prepare a study on the nature and extent of the required measures. 2 Based on the study, the cantonal authority shall in accordance with paragraph 1 order the remediation measures. In the case of hydropower plants, the bed load must wherever possible be made to pass through the installation. 3 Before it decides on the remediation project in the case of hydropower plants, it shall consult the FOEN. The FOEN shall examine with a view to an application under Article 30 paragraph 1 EnO69 whether the criteria of Annex 3 number 2 EnO are met.70 4 The persons responsible for hydropower plants shall verify the effectiveness of the measures taken in accordance with instructions from the cantonal authority. 68 Inserted by No I of the O of 4 May 2011, in force since 1 June 2011 (AS 2011 1955). 70Second sentence amended by Annex 7 No II 2 of the Energy Ordinance of 1 Nov. 2017, in force since 1 Jan. 2018 (AS 2017 6889). |