Waters Protection Ordinance
(WPO)

of 28 October 1998 (Status as of 1 February 2023)


Open article in different language:  DE  |  FR  |  IT
Art. 42c Measures to remediate the bed load budget 68

1 In the case of in­stall­a­tions which ac­cord­ing to the plan re­quire meas­ures to re­medi­ate the bed load budget, the can­tons shall pre­pare a study on the nature and ex­tent of the re­quired meas­ures.

2 Based on the study, the can­ton­al au­thor­ity shall in ac­cord­ance with para­graph 1 or­der the re­medi­ation meas­ures. In the case of hy­dro­power plants, the bed load must wherever pos­sible be made to pass through the in­stall­a­tion.

3 Be­fore it de­cides on the re­medi­ation pro­ject in the case of hy­dro­power plants, it shall con­sult the FOEN. The FOEN shall ex­am­ine with a view to an ap­plic­a­tion un­der Art­icle 30 para­graph 1 EnO69 wheth­er the cri­ter­ia of An­nex 3 num­ber 2 EnO are met.70

4 The per­sons re­spons­ible for hy­dro­power plants shall veri­fy the ef­fect­ive­ness of the meas­ures taken in ac­cord­ance with in­struc­tions from the can­ton­al au­thor­ity.

68 In­ser­ted by No I of the O of 4 May 2011, in force since 1 June 2011 (AS 2011 1955).

69 SR 730.01

70Second sen­tence amended by An­nex 7 No II 2 of the En­ergy Or­din­ance of 1 Nov. 2017, in force since 1 Jan. 2018 (AS 2017 6889).