|
Art. 27 Construction documentation
1 Licence holders must fully document the construction of buildings and the manufacture and assembly of technical equipment, as well as implemented controls and inspections in a retraceable manner at all times. 2 All documentation must be securely archived until completion of the decommissioning, or until closure or expiry of the specified monitoring period. 3 All modifications carried out on the installation, including decommissioning or closure, must be documented. 4 The licence holder must hand over all documentation to ENSI after the installation has been decommissioned, or after it has been closed or the period of observation has expired to the Department.34 5 ENSI shall specify the detailed requirements on documentation and archiving in guidelines.35 34 Amended by Annex No 12 of the O of 12 Nov. 2008 on the SwissFederal Nuclear Safety Inspectorate, in force since 1 Jan. 2009 (AS 2008 5747). 35 Amended by Annex No 12 of the O of 12 Nov. 2008 on the SwissFederal Nuclear Safety Inspectorate, in force since 1 Jan. 2009 (AS 2008 5747). |