|
Art. 53 Clearance measurement of materials
1 Any person intending to remove materials from controlled zones of a nuclear installation must carry out a clearance measurement with appropriate quality assurance and document it.59 2 Quantities of material weighing more than 1,000 kilograms or with a volume greater than a cubic metre must be reported to ENSI at least 10 days prior to removal from the nuclear installation, and the required documentation must be submitted.60 3 ENSI shall specify the detailed requirements on clearance measurement and reporting in guidelines.61 59 Amended by No I of the O of 7 Dec. 2018, in force since 1 Feb. 2019 (AS 2019 183). 60 Amended by Annex No 12 of the O of 12 Nov. 2008 on the SwissFederal Nuclear Safety Inspectorate, in force since 1 Jan. 2009 (AS 2008 5747). 61 Amended by Annex No 12 of the O of 12 Nov. 2008 on the SwissFederal Nuclear Safety Inspectorate, in force since 1 Jan. 2009 (AS 2008 5747). |