Art. 19a Requirements
1 Machines and equipment for use on construction sites with internal combustion compression-ignition engines having a power output of more than 18 kW (construction machines) shall comply with the requirements specified in Annex 4 Number 3. 2 New construction machines are only to be placed on the market if their conformity with the requirements specified in Annex 4 Number 3 has been demonstrated. 3 Construction machines are only to be operated with a particle filter system whose conformity with the requirements specified in Annex 4 Numbers 32 and 33 has been demonstrated. 4 The authority may on request grant exemptions from the requirements set out in Annex 4 Number 3 for construction equipment used for test or demonstration purposes. The exemptions are granted for a maximum of 10 days.16 16Inserted by No I of the O of 14 Oct. 2015, in force since 16 Nov. 2015 (AS 2015 4171). |