Art. 13 Emission measurements and inspections
1 The authorities shall monitor compliance with emission limitation requirements. They shall carry out their own emission measurements or inspections or shall have these carried out on their behalf. 2 If possible, the first measurement (acceptance measurement) or inspection must be carried out within three months, but no later than twelve months after the commissioning of the new or retrofitted installation. The foregoing is without prejudice to different provisions in Annex 3.9 3 The measurement or inspection is generally to be repeated as follows, without prejudice to provisions to the contrary specified in Annexes 2, 3 and 4:
4 In the case of installations which may produce significant levels of emissions, the authorities shall order continuous measurement and recording of emissions, or of another operating parameter which permits emission control. 9 Amended by No I of the O of 11 April 2018, in force since 1 June 2018 (AS 2018 1687). 10 The correction of 16 April 2019 concerns the Italian text only (AS 2019 1225). 11Amended by No I of the O of 11 April 2018, in force since 1 June 2018 (AS 2018 1687). |