Art. 18 Removed topsoil and subsoil
1 Removed topsoil and subsoil must be recovered in full if possible provided:
2 In the case of recovery, the topsoil and subsoil must be processed in accordance with Articles 6 and 7 SoilPO. 15 SR 814.12 |