Ordinance
on the Avoidance and the Disposal of Waste
(Waste Ordinance, ADWO)


Open article in different language:  DE  |  FR  |  IT
Art. 31 Construction

Fa­cil­it­ies may be con­struc­ted or their ca­pa­city in­creased for the in­cin­er­a­tion of waste provided the struc­tur­al ele­ments guar­an­tee that:36

a.
no dif­fuse waste gases are emit­ted;
b.37
at fa­cil­it­ies that treat li­quid waste with a flash­point be­low 60 °C and in­fec­tious spe­cial waste, such waste can be placed in the in­cin­er­a­tion cham­ber sep­ar­ately from the oth­er waste and as dir­ectly as pos­sible;
c.38
at fa­cil­it­ies that in­cin­er­ate mu­ni­cip­al waste or waste of sim­il­ar com­pos­i­tion, at least 80 per cent of the en­ergy con­tent is used out­side the fa­cil­it­ies; the use of en­ergy to cap­ture CO2 from flue gas is re­garded as use out­side the fa­cil­it­ies.

36 Amended by No I of the O of 23 Feb. 2022, in force since 1 April 2022 (AS 2022 161).

37 Amended by No I of the O of 12 Feb. 2020, in force since 1 April 2020 (AS 2020 801).

38 In­ser­ted by No I of the O of 23 Feb. 2022, in force since 1 April 2022 (AS 2022 161).

Diese Seite ist durch reCAPTCHA geschützt und die Google Datenschutzrichtlinie und Nutzungsbedingungen gelten.

Feedback