Waters Protection Ordinance
(WPO)

English is not an official language of the Swiss Confederation. This translation is provided for information purposes only and has no legal force.

of 28 October 1998 (Status as of 1 January 2021)


Open article in different language:  DE  |  FR  |  IT
Art. 8 Infiltration

1 The in­filt­ra­tion of pol­luted waste wa­ter is pro­hib­ited.

2 The au­thor­it­ies may au­thor­ise the in­filt­ra­tion of com­mun­al waste wa­ter or of oth­er pol­luted waste wa­ter of com­par­able com­pos­i­tion, if:

a.
the waste wa­ter has been treated and meets the re­quire­ments for dis­charge in­to wa­ters;
b.
in the case of the ground­wa­ter con­cerned, wa­ter qual­ity re­quire­ments ac­cord­ing to An­nex 2 are met after in­filt­ra­tion of the waste wa­ter;
c.
in­filt­ra­tion en­sues at an in­stall­a­tion in­ten­ded for the pur­pose, the dir­ect­ives of the SoilPO9 are not ex­ceeded even in the long term, or in the ab­sence of dir­ect­ives soil fer­til­ity is also guar­an­teed in the long term; and
d.
re­quire­ments val­id for waste wa­ter treat­ment plants which dis­charge waste wa­ter in­to a body of wa­ter are met (Arts. 13–17).

Diese Seite ist durch reCAPTCHA geschützt und die Google Datenschutzrichtlinie und Nutzungsbedingungen gelten.

Feedback
Laden